PROJECT

STATUS

COMMENT

New Track

On-going Over 400 feet in place and ballasted. Materials on-hand for another 700 feet

Engine House

incomplete Partially framed, need to get roof on before first rains (end of Oct.)

Loading Ramp

open  

Crossing Signal

open full-sized Operating crossing gate needs restoration and assembly. The second cross-buck signal is out for welding.

Short Trestle

open  

Road Crossing

open need to order welded panel track able to handle 80 ton truck traffic.

Close north loop

in progress switch and crossing panels ordered, should be here mid August

Diamond Crossing

open need to design and fabricate

 

 

 


 