February, 2007

In February we worked on the driveway cut at the end of the North Loop. A lot of manual labor here...after the sawcut, all of the asphalt had to be picked out. We then laid down base rock and tamped it firm before putting down the rebar and wire. Next came the base concrete layer - a minimum 4", which, once cured, had the panel track hilti'd down to it. After the ends of the loop were aligned and connected with the existing track, a finish concrete coat was put down to make the track level with the driveway.


Centerline of the cut is marked
 


Saw-cut is made

 


Saw-cut closeup
 


Dig out the asphalt
 


Found a second layer of asphalt, which had to be cut and dug out.
 


 

Forms in place for base pour
 


Coated with bonding agent, ready for pour
 


Ready for rebar
 


Base pour
 

 


Working on base pour
 


Panel track connected



Laying panel track

 


Ready to connect panel to one end

 

Aligning to existing track

 

Making the connection to the other end

 

Finish coat nearly completed

 

Finish coat completed

 

Finish coat curing

   
   

 

     